When purchasing a SolarEdge inverter, do I need to have the installation design approved by a fire inspector?


Yes, under the new regulations that came into effect on the 19th of September 2020 – all PV installations above 6.5 kWp must be approved by a fire inspector and reported to the State Fire Service.

When purchasing a SolarEdge inverter, do I need to have the installation design approved by a fire inspector?


Yes, under the new regulations that came into effect on the 19th of September 2020 – all PV installations above 6.5 kWp must be approved by a fire inspector and reported to the State Fire Service.